Close Menu
The North JournalsThe North Journals

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    19 in 20 Nigerian health facilities fall short of basic medical waste standard – WHO/UNICEF

    August 21, 2026

    Lagos roundtable to drive new investment in Africa’s forest economy

    August 19, 2026

    How Nigeria is using local data to change the fight against malaria

    August 13, 2026
    Facebook X (Twitter) Instagram YouTube
    • ABOUT US
    • WORK WITH US
    • CONTACT US
    Wednesday, August 26
    Facebook X (Twitter) Instagram
    Subscribe
    The North JournalsThe North Journals
    • Home
    • Newsbeat
      • Agriculture
      • Art/Life
      • Business
      • Economy
      • Education
      • Entertainment
      • Health
      • Judiciary
      • News
      • Technology
      • Travel
      • Foreign
    • Editorial
    • Opinion
      • Diaries
    • Travelogue
    • Journals
      • Engineering
      • History
      • Law
      • Medicine
      • Politics
      • Research
      • Science
      • Climate Change
      • Psychology
      • Sociology
    • Documentaries
    • Guest Post
    The North JournalsThe North Journals
    Home » FCT Minister Revokes Apo-Karshi Road Contract, Re-awards to SCC for Non-Performance
    Politics

    FCT Minister Revokes Apo-Karshi Road Contract, Re-awards to SCC for Non-Performance

    Wike vows focus on completing ongoing road projects ahead of 2026 political year.
    Atoyebi AdenikeBy Atoyebi AdenikeNovember 27, 2025No Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Wike vows focus on completing ongoing road projects ahead of 2026 political year.
    Wike vows focus on completing ongoing road projects ahead of 2026 political year.
    Share
    Facebook Twitter LinkedIn Pinterest Email

    By Atoyebi Nike

    The Minister of the Federal Capital Territory (FCT), Nyesom Wike, has terminated the 13-kilometre Apo-Karshi Road contract previously awarded to Kakatar Construction Company Ltd. in 2011, citing non-performance. The project has been re-awarded to SCC under an emergency arrangement.

    Wike announced the decision on Thursday during an inspection tour of ongoing roads, including the Karu-Customs-CBN Road, Gishiri-Katampe Road, and Apo-Wasa Carriageway. “We cannot continue to play politics with the welfare of the people. That road has been terminated, and SCC has started work,” he said.

    The minister also confirmed the Kubwa-Bwari road project has commenced and will serve as an alternative route. At Karu, he assured a shop owner affected by demolition for obstructing a water channel that adequate compensation would be paid, emphasizing public safety over emotions.

    Wike expressed satisfaction with residents’ reception at the project sites, noting it reflected approval of the government’s development efforts. He stated that ongoing road projects would be commissioned during President Bola Tinubu’s third-anniversary celebrations.

    Looking ahead, Wike said the FCTA would not award new contracts in 2026, choosing instead to complete all ongoing projects before the political year.

    See also  Wike Orders Abuja Cleanup, Launches Crackdown on Beggars, Miscreants
    Apo-Karshi Road FCT Government Projects Infrastructure Kubwa-Bwari Road Nyesom Wike Road Construction SCC
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Atoyebi Adenike
    • Website

    Related Posts

    ADC Youth Wing Fires Back At Babachir Lawal, Calls Him A “Dismissed Grass-Cutter” In Scathing Rejoinder

    June 2, 2026

    27-Year Study Exposes Deep Imbalance in Presidential Visits Across Nigeria

    April 6, 2026

    Chris Kwaja Gains Support for Plateau North Senate Bid

    March 10, 2026

    Comments are closed.

    Our Picks
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss

    19 in 20 Nigerian health facilities fall short of basic medical waste standard – WHO/UNICEF

    Headlines August 21, 2026

    About 19 in every 20 health care facilities in Nigeria fall short of the basic…

    Lagos roundtable to drive new investment in Africa’s forest economy

    August 19, 2026

    How Nigeria is using local data to change the fight against malaria

    August 13, 2026

    Retired Ghanaian miner rejects calls for special treatment for Adamus Resources Limited

    August 13, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us
    About Us

    The North Journals is a hybrid publication that combines the power of investigative journalism with the depth of research-driven analysis. Rooted in Nigeria and inspired by Pan-African realities, we tell stories that matter — stories of people, communities, and issues often left out of mainstream narratives.
    Address: Abuja, Nigeria
    Email Us: info@thenorthjournals.com

    Our Picks
    New Comments
    • Theophilus Thomas on A School-Based Book Club Model Is Rebuilding Reading Habits Among Students in Zaria
    • Sani Tijjani Ibrahim on Book Review: Abandoned
    • Home
    • Travel
    • Politics
    • Business
    • Buy Now
    © 2026 The North Journals. Designed by AkinMore.

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.